Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

Contact Supplier

Product Highlights

  • 20 Years Experience: Providing one-stop design and manufacturing solutions from mold design to mass production.
  • ISO & IATF Certified: Certified under ISO9001:2015 and IATF16949 standards with full inspection before packaging.
  • Fast Quotation: Quotation provided within 24 hours or 2 days after receiving detailed information.
  • Direct Factory Source: 100% direct factory with three manufacturing plants located in Dongguan, Guangdong.
  • Custom OEM Support: OEM services available based on customer design drawings or original samples.
  • Long Fan Life: Hydro bearing fans designed for a lifespan of up to 30,000 hours.
  • Multi-Angle Design: Features multi-angle adjustability and cable management for optimal cooling.
  • RGB LED Lighting: Equipped with RGB LED color options for enhanced visual aesthetics.

Product Images of Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance pictures & photos
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
  • Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
  • Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
    Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

Find Similar Products

Product Description

 

Our Advantages

 

QUALITY is our culture.
RICH EXPERIENCE 20 years experience of One-stop Design and Manufacturing Solutions from mold Designing (Free DFM) - making to mass production.
COST CONTROL Optimize cost maximizely from the aspects of materials buying,production,processing and transportation,etc.
QUALITY CONTROL Following ISO9001 and IATF16949 Standards/Full inspected before package.
STRONG EXECUTIVE POWER
Quotation in 24 HOURS/Quick response/Fast delivery.


 
 

Product Description

Type Heatsink Heatsink Material
Copper & Aluminum
Fan Life
30000 Hrs
Power
3.1W
Air Volume 58.5CFM Noise
63dBA
Fan Size
120x120x25mm 
Bearing
Fluid Bearing
Power Interface
4pin
Fan Speed Control
1500rpm
Application
Computer Case

Place of Origin
Guangdong, China
LED Color
RGB Color Black
Material
Copper Aluminum Bonding
Usage
CPU Heat Exchange
Bearing type
Hydrao Bearing
Shipping
DHL.FEDEX UPS EMS TNT..etc
MOQ 50 PCS OEM Support
Keyword
Heat Pipe Cpu Cooler
Voltage
DC 12V
 
 

Detailed Photos

 
 
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
 
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
 
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
 

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

 

Certifications

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

Inspections

 

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
 
 

Product equiment

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

 

 

Packaging & Shipping

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

 

Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance
Premium Temperature Control Radiator Cooling Heatsink for Optimal Performance

Premium Temperature Control Radiator Cooling Heatsink for Optimal PerformancePremium Temperature Control Radiator Cooling Heatsink for Optimal Performance

RFQ

Q1. Are you a factory or trade company?
We are 100% direct factory. Ruiquan have 3 factories, the headquarters is located in Dongguan city, Guangdong province. Welcome to visit our factory.


Q2. What kind of production service do you provide?
All kinds of heat sink including aluminum extrusion heat sink, cold forging heat sink, precision mold making, aluminum/zinc die casting parts, heat pipe and cooling fans.
 
Q3.What if I want existing model?
We have tens of thousands of existing model to provide customers, and detail description with drawings. If there are no identical products, we will recommend similar products for you.

Q4. How about the lead time?
Mass production: 1-3 weeks
Depends on processing and quantity. We can make a special arrangement if your order is urgent.

Q5. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦Make the operation instruction once the sample is approved.
♦100% inspect the products before shipment.


Q6. How long should we take for a quotation?
After receiving detailed information(your 2D/3D/CAD drawings or samples,Material, Finish, and Quantity), we will quote you within 2 days.

Q7. What is your payment term?
Sample: 100%paid.
Goods: 30% prepaid, balance T/T before shipment.


Q8. How soon can I get samples and how much the fee?
Depending on your specific project, it usually takes 15 to 25 days. the fee depends on the product drawing, and the fee will be returned to your bulk order.

Q9. How to enjoy the OEM services?
Usually, base on your design drawings or original samples, we give some technical proposals and a quotation to you, after your agreement, we produce for you.

Q10.Will my drawing safe after you get it?
Yes, we can sign the NDA before got your drawing.

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI232738". Items marked "verified" are certified.

Watch Video
Watch Video
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.
Dongguan Hangjia Metal Technology Co., Ltd.

About Our Factory & Business Background

Address
Room 101, Building 1, 9 Tianbian He He Road, Shipai Town, Dongguan, Guangdong, China
Terms of Payment
LC, T/T, PayPal, Western Union, Money Gram
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, FAS, DDP, CIP, FCA
Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Nearest Port
Shenzhen, Guangzhou

Our Production Capability & Technical Expertise

Main Products
Metal Products, Can Machine Works, Die Casting, Sand Casting, Machining Parts, Forging Press, Stamping Parts, LED Heat Sink, Plastic Parts, Silicone Parts

Our Industry Experience & Global Business Record

Export Year
2023-09-04
Main Markets
North America, Southeast Asia, Eastern Asia, Western Europe

FAQ

Are you a factory or trade company?
We are 100% direct factory. Ruiquan have 3 factories, the headquarters is located in Dongguan city, Guangdong province. Welcome to visit our factory.
What kind of production service do you provide?
All kinds of heat sink including aluminum extrusion heat sink, cold forging heat sink, precision mold making, aluminum/zinc die casting parts, heat pipe and cooling fans.
What if I want existing model?
We have tens of thousands of existing model to provide customers, and detail description with drawings. If there are no identical products, we will recommend similar products for you.
How about the lead time?
Mass production: 1-3 weeks Depends on processing and quantity. We can make a special arrangement if your order is urgent.
How about your quality?
We have got ISO9001:2015 and IATF16949 certificates. Make the operation instruction once the sample is approved. 100% inspect the products before shipment.
How long should we take for a quotation?
After receiving detailed information(your 2D/3D/CAD drawings or samples,Material, Finish, and Quantity), we will quote you within 2 days.
What is your payment term?
Sample: 100%paid. Goods: 30% prepaid, balance T/T before shipment.
How soon can I get samples and how much the fee?
Depending on your specific project, it usually takes 15 to 25 days. the fee depends on the product drawing, and the fee will be returned to your bulk order.
How to enjoy the OEM services?
Usually, base on your design drawings or original samples, we give some technical proposals and a quotation to you, after your agreement, we produce for you.
Will my drawing safe after you get it?
Yes, we can sign the NDA before got your drawing.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now